Osborne Energy Solutions
Home
Areas of Expertise
  • Excavation
  • Municipal
  • Oilfield Services
  • Snow Removal
  • Rentals
  • Metalworks
Work That Speaks
Work With Us
Why Osborne?
Osborne Energy Solutions
Home
Areas of Expertise
  • Excavation
  • Municipal
  • Oilfield Services
  • Snow Removal
  • Rentals
  • Metalworks
Work That Speaks
Work With Us
Why Osborne?
More
  • Home
  • Areas of Expertise
    • Excavation
    • Municipal
    • Oilfield Services
    • Snow Removal
    • Rentals
    • Metalworks
  • Work That Speaks
  • Work With Us
  • Why Osborne?
  • Home
  • Areas of Expertise
    • Excavation
    • Municipal
    • Oilfield Services
    • Snow Removal
    • Rentals
    • Metalworks
  • Work That Speaks
  • Work With Us
  • Why Osborne?

experience that speaks for itself.

Just a few of the many projects we’ve completed:

Private Road Reconstruction

 Reconstructed an existing private road, establishing proper crown and ditch for drainage and installing compacted gravel surfacing to improve drivability and durability. 

Private Water Well Pad Construction

Bladed an access path and constructed a leveled pad to support a drilling rig for water well rework operations. The project provided safe, stable site conditions for efficient well access and equipment setup. 

Private Homeowner Concrete Demo

 Removed existing concrete around the home to allow access for foundation repair, then reinstalled the driveway, sidewalks, and patio to their original layout and finish. The project restored full functionality and appearance to the property following structural repair. 

Private Homeowner Foundation Repair

 Excavated around the home’s foundation, installed helical piers to lift and stabilize the structure, and added a perimeter and downspout drain system for improved water management. The foundation was then backfilled and compacted to restore site integrity. 

Just a few of the many projects we’ve completed.

Red Grade Trailhead Project

 Site preparation for the Red Grade Trailhead, including tree and vegetation clearing, mass grading, and construction of two parking lots and a new entrance road. Work also included placement and compaction of road base, installation of fencing, and setting of concrete parking blocks to complete the site. 

Private Parking Lot Reconstruction

 Reconstructed an existing parking lot to improve functionality and drainage. Work included establishing new drainage systems, installing compacted gravel surfacing, and expanding the lot to increase capacity.

Yampa Valley Airport Project

 Installed 24-inch reinforced concrete pipe (RCP) to manage stormwater flow, providing a reliable and durable solution for long-term drainage needs.  

Dayton Water & Sewer Reconstruction Project

 Installed new piping and manholes to expand and strengthen the city’s sewer and water system, ensuring reliable infrastructure and improved service capacity for the community.  

Gillette Regional Water Extension Project

 Completed installation of all underground piping systems connecting metering buildings and pump stations, including the addition of fire hydrants and all associated valving to ensure full functionality and reliability.  

Glenrock Power Plant Project

 Installed 12,000 feet of volcanic ash line steel pipe designed to transfer highly abrasive materials and waste, ensuring a durable and efficient system built to withstand demanding conditions.  

Rozet Ranchettes Metering Building Project

 Connected a rural subdivision to the city water supply by tapping into a 48-inch water main. In addition, installed the building and internal piping necessary to house and operate the metering system, ensuring reliable distribution and accurate measurement.  

Boxelder Road Street Reconstruction

 Completed installation of all new valves, hydrants, and fittings to optimize system flow, increase efficiency, and support future demand.  

Campbell County Rural Fire Station Project

 Constructed a slab-on-grade building designed to securely house rural fire equipment and support local emergency services.  

Gillette Regional Water Project

 Excavated the building site, prepared and poured the concrete foundation, and installed all associated piping in preparation for the placement of a prefabricated concrete building.  

Dayton Water Tank Improvement Project

 Excavated 12 feet of soil surrounding the water tank to prevent pressure from compromising the steel structure. Following the excavation, we reinforced the integrity of the tank by resealing all nuts and bolts with industrial-grade epoxy, ensuring long-term durability and performance.  

Glenrock Power Plant Project

 Completed reconstruction of the ash pond, enhancing storage capacity and optimizing performance for long-term operation.  

Copyright © 2025 Osborne Energy Solutions - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept